PV (cell) production facility specialist A company that prioritizes quality and customer satisfaction

Construction Performance

Construction Performance

  • Home>
  • Construction Performance>
  • Construction Performance

Automation Business

Construction Performance
Client Year Projects Contract price (in thousand won), VAT excluded
Sebang Global Battery 1996 Dumping 4 sets of m/c 40,000
1997 4 sets of washing dryerand 5 othermodels 70,000
1999 Manufacturing and installation of the lead ingot feeding conveyor system 30,000
Hyundai Enercell 1997 Manufacturing of the lead ingot feeding conveyor system 30,000
1998 4 sets of washing dryers and 5 othermodels 40,000
1998 Dumping 4 setsof m/c (Geoncheon Factory) 40,000
Daewoo Electronics 1995 Washing machine motor cover transfer machine 80,000
Washing machine 180 degree rotation lift and water pressure checking device 40,000
Microwave magnetron head conveyor and 7 other models 40,000
1996 Cleaner motor A/R line and 5 other models 60,000
2001 Development of the spray coating robot gun (manual/automatic) 68,000
Samsung Electronics 2001 Paper pipe& atator fiber inserter, funding pole grinder 36,000
Daewoo Motors 1999 Crank shaft measuring device assembly 20,000
Crank shaft fixture assembly 7,000
2000 Cam shaft multi head assembly 14,000
Kia Motors 2001 New-generation A/T line in conveyor 30,000
Hyundai Motors 2000 Riddling equipment assembly 11,000
Korea Powertrain 2000 F/cover 180 degree rotation and reverse rotation device 28,000
F/cover auto conveyor assembly
Nippon Denchi 2001 Exporting dumping machine 40,000
Symphony Energy 2007 Manufacturing and installation of the module conveyance line system 984,000
2008 Manufacturing and installation of the lay-up equipment ribbon cutter 820,400
Forced convection heating oven 150,000
2009 Automatic completion check line for the Symphony EnergyCo., Ltd. photovoltaic module 371,100
Photovoltaic module soldering& glass loading m/c 270,000
Order and installation completion of the full automaticphotovoltaic module checking line 404,000
Photovoltaic module glass&film loading machine, automaticsolderingmachine 373,300
Topsun 2009 Manufacturing and installation of the photovoltaic module production lineautomation facility 200,000
2010 Manufacturing of the photovoltaic module lay-up equipment 180,000
2011 Photovoltaic module heating/cooling oven system 150,000
Manufacturing of the photovoltaic module lay-up equipment 200,000
2012 Manufacturing and installation of the photovoltaic module production lineautomation facility 30,000
2013 Manufacturing of the photovoltaic module repair table 35,000
LSIS 2009 Rationalization of the photovoltaic module production line – 25mw 328,400
Photovoltaic module production 2ndline – 25mw 960,000
2010 Photovoltaic module production line 3rd and 4thlines – 25mw 1,020,000
Signed contract for the photovoltaic production 5thline(25mw), glass cleaning&rectificationline 1,140,000
2012 Remodeling/ rationalization of the photovoltaic production 2nd line 375,000
Shinsung CS 2010 Automaticsolderingmachine – bus barsoldering/ ribbon cuttingmachine 160,000
2011 Signed contract for the photovoltaic production line 150,000
DAEWOO ELECTRONIC COMPONENTS 2012 In-line selective soldering machine 119,340
2013 Manufacturing and installation of the ACU PCBproduction line 357,500
Manufacturing and installation of the PWM PCBproduction line 180,500
Design, manufacturing and delivery of the OBCexclusive jig 180,500
2014 Development and installation of the PWM aging tester 111,250
Rationalization of the ACU-PWMprocess 233,000
Design, manufacturing and delivery of the OBC leak tester 60,690
Remodeling of the PWM hybrid aging tester 12,000