
Automation Business
| Client | Year | Projects | Contract price (in thousand won), VAT excluded |
|---|---|---|---|
| Sebang Global Battery | 1996 | Dumping 4 sets of m/c | 40,000 |
| 1997 | 4 sets of washing dryerand 5 othermodels | 70,000 | |
| 1999 | Manufacturing and installation of the lead ingot feeding conveyor system | 30,000 | |
| Hyundai Enercell | 1997 | Manufacturing of the lead ingot feeding conveyor system | 30,000 |
| 1998 | 4 sets of washing dryers and 5 othermodels | 40,000 | |
| 1998 | Dumping 4 setsof m/c (Geoncheon Factory) | 40,000 | |
| Daewoo Electronics | 1995 | Washing machine motor cover transfer machine | 80,000 |
| Washing machine 180 degree rotation lift and water pressure checking device | 40,000 | ||
| Microwave magnetron head conveyor and 7 other models | 40,000 | ||
| 1996 | Cleaner motor A/R line and 5 other models | 60,000 | |
| 2001 | Development of the spray coating robot gun (manual/automatic) | 68,000 | |
| Samsung Electronics | 2001 | Paper pipe& atator fiber inserter, funding pole grinder | 36,000 |
| Daewoo Motors | 1999 | Crank shaft measuring device assembly | 20,000 |
| Crank shaft fixture assembly | 7,000 | ||
| 2000 | Cam shaft multi head assembly | 14,000 | |
| Kia Motors | 2001 | New-generation A/T line in conveyor | 30,000 |
| Hyundai Motors | 2000 | Riddling equipment assembly | 11,000 |
| Korea Powertrain | 2000 | F/cover 180 degree rotation and reverse rotation device | 28,000 |
| F/cover auto conveyor assembly | |||
| Nippon Denchi | 2001 | Exporting dumping machine | 40,000 |
| Symphony Energy | 2007 | Manufacturing and installation of the module conveyance line system | 984,000 |
| 2008 | Manufacturing and installation of the lay-up equipment ribbon cutter | 820,400 | |
| Forced convection heating oven | 150,000 | ||
| 2009 | Automatic completion check line for the Symphony EnergyCo., Ltd. photovoltaic module | 371,100 | |
| Photovoltaic module soldering& glass loading m/c | 270,000 | ||
| Order and installation completion of the full automaticphotovoltaic module checking line | 404,000 | ||
| Photovoltaic module glass&film loading machine, automaticsolderingmachine | 373,300 | ||
| Topsun | 2009 | Manufacturing and installation of the photovoltaic module production lineautomation facility | 200,000 |
| 2010 | Manufacturing of the photovoltaic module lay-up equipment | 180,000 | |
| 2011 | Photovoltaic module heating/cooling oven system | 150,000 | |
| Manufacturing of the photovoltaic module lay-up equipment | 200,000 | ||
| 2012 | Manufacturing and installation of the photovoltaic module production lineautomation facility | 30,000 | |
| 2013 | Manufacturing of the photovoltaic module repair table | 35,000 | |
| LSIS | 2009 | Rationalization of the photovoltaic module production line – 25mw | 328,400 |
| Photovoltaic module production 2ndline – 25mw | 960,000 | ||
| 2010 | Photovoltaic module production line 3rd and 4thlines – 25mw | 1,020,000 | |
| Signed contract for the photovoltaic production 5thline(25mw), glass cleaning&rectificationline | 1,140,000 | ||
| 2012 | Remodeling/ rationalization of the photovoltaic production 2nd line | 375,000 | |
| Shinsung CS | 2010 | Automaticsolderingmachine – bus barsoldering/ ribbon cuttingmachine | 160,000 |
| 2011 | Signed contract for the photovoltaic production line | 150,000 | |
| DAEWOO ELECTRONIC COMPONENTS | 2012 | In-line selective soldering machine | 119,340 |
| 2013 | Manufacturing and installation of the ACU PCBproduction line | 357,500 | |
| Manufacturing and installation of the PWM PCBproduction line | 180,500 | ||
| Design, manufacturing and delivery of the OBCexclusive jig | 180,500 | ||
| 2014 | Development and installation of the PWM aging tester | 111,250 | |
| Rationalization of the ACU-PWMprocess | 233,000 | ||
| Design, manufacturing and delivery of the OBC leak tester | 60,690 | ||
| Remodeling of the PWM hybrid aging tester | 12,000 |